Updated Port facilities specifications for the safe berthing and un-berthing of ships (dimensions as length and Depth of berth or ship draught) currently provided at all of the Shahid Rajaee port berths and they are as follows

Note: Maximum permitted draught is calculated using available hydrographic data and safety factors

Maximum authorized ship Draught(meter)

 Row  name of berth  Maximum authorized ship length; MSL (m)  Maximum authorized ship draught; MSD (m) Remarks
 1  berth No. 1
(Oil berth)
 230  5.11  
 2  berth No. 2
(Oil berth)
 230 5.11   
 3  berth No. 3
(Multipurpose berth)
 200  7.10  For more information see note 3
 4  berth No. 4
(Container berth)
 310  12  
 5  berth No. 5
(Container berth)
 270  5.12  
 6  berth No. 6
(Container berth)
 250  2.12  
 7  berth No. 7
(Container berth)
 210  3.11  
 8  berth No. 8
(Container berth)
 100  5.5  
 berth No. 9
(General Cargo berth)
 200  10  RO-RO < 100 M
 10  berth No. 10
(General Cargo berth)
 220  2.10  RO-RO<120 M
 11  berth No. 11
(General Cargo berth)
 250  5.10  RO-RO < 150 M
 12  berth No. 12
(General Cargo berth)
 300  11  RO-RO < 200M
 13  berth No. 13
(Multipurpose berth)
 300  7.11  For more information see note 4
 14  berth No. 14
(General Cargo berth)
 300  5.12  For more information see note 4
 15  berth No. 15
(General Cargo berth)
 300  5.11  For more information see note 4
 16  berth No. 16
(General Cargo berth)
 300  5.10  RO-RO < 250 M
 17  berth No. 17
(General Cargo berth)
 250  5.10  RO-RO < 200 M
 18  berth No. 18
(General Cargo berth)
 220  5.10  RO-RO < 170 M
 19  berth No. 19
(Multipurpose berth)
 200  2.10  RO-RO < 150M
For more information see note 3
20   berth No. 20
(Multipurpose berth)
 185  10  RO-RO< 150M
For more information see note 3
 21  berth No. 21  200 14   
 22  berth No. 22  220  14  
 23  berth No. 23  250  14  
 24  berth No. 24  300  5.14  
 25  berth No. 25 (Container berth)  390  15  For more information see note 5
 26  berth No. 26 (Container berth)  350  15  For more information see note 5
 27  berth No. 27 (Container berth)  350  15  For more information see note 5
 28  berth No. 28  230  14  
 29  berth No. 29  200  14  
 30  berth No. 30  240  14  
 31  berth No. 31  300  14  

1.At the Berths no.13,14,15(sequentially)RO-RO ships have prior sitting than other ships

2.Except berth no.9 all the ships have been berthed by port side, normally; thus berthing by starboard side at berths no. 6,7,19  and by port side at berths no. 9 depends on the harbor master permit

3.Tankers can be berthed at the berths no. 3,19,20 with the more than announced draught, according to the discharge and loading rate and the low limit tide conditions, as well as harbor master permit

4.Administrative coordination between harbor master and cargo handling department will be necessary for proceedings berthing the ships with over than authorized draught determined for berths no. 13,14,15 according to TPC and discharge and loading rate of these ships

5.The limit 15.5  meters currently is the maximum draught to berthing ships due to the depth of the Shahid Rajaee access channel

6.Mentioned specifications at the related tables may be changed for the reasons of circumstances as new results of hydrography proceedings in the basins and  access channel of the port, new Comments of Near-Miss or Marine casualties department, or other Competent authorities

7.Berthing the ships with more than determined length will be done for the container berths no. 4,5,6,7 merely by the harbor master permission

********************

Hormuzgan Steel Complex finger jetties

Safe dimensions (lengths and draught) of ships for berthing and un-berthing ships at Hormuzgan Steel Complex finger jetties

 Remarks  Maximum allowable draught for ships(meter)
Maximum authorized length of ships(meter) Jetty no  Row
 Arrivals of ships to the pier are done at the end of the high tide water  13  260  Liquid(oil) jetty  1
 Arrivals of  full load ships to the pier are done at the end of the high tide water  13  260  Dry bulk jetty  2


********************

The Persian Gulf port (Bandare Khalije Fars) Berths specifications

Safe Dimensions (lengths and drains) of ships for berthing and un-berthing ships at

The Persian Gulf port (Bandare Khalije Fars)

 Remarks Maximum allowable draught for ships meter  Maximum authorized length of ships meter
Jetty no  Row
 Pilotage of  the ships to the pier with more than 7.5 meter draught are done at the high tide water  5.7  150  Jetty no.1  1
  7  100  Jetty no.2  2
   5.7  80  Jetty no.3  3
   5.7  150  Jetty no.4  4
   5.7  115  Jetty no.5  5
   -  -  Jetty no.6  6
   5.7  125  Jetty no.7  7
   5.7  125  Jetty no.8  8
   5.7  70  Jetty no.9  9
   5.7  125  Jetty no.10  10

1.Pilotage services for ships with a draught of more than  7 meters are provided in high tide water.

2.Berthing by starboard side at berths no.10  and by port side at berths no. 1 depends on the harbor master permit.

3.Berthing ships at the berth no.10  will be possible when:

    3.1 The berth is clear(empty berth)

    3.2 The vessel berthed at berths no7 and 8 is only one barge or one tug boat(without the barge); or one ship.

4. Berthing ships with more than the capacity of the table is possible by these conditions;

    4.1 Request of shipping companies and port authorities(Non-containerized cargo section),

    4.2 Approval of the Harbor Master